COME TO VASCO WITH PROBLEMS,
LEAVE WITH SOLUTIONS.

Choose a company with experience – let Vasco handle all of your asphalt, commercial paving, and maintenance needs. Vasco is ready for any project ranging from large commercial parking lots to pothole patching. The Vasco excavating division specializes in site work, utilities and grading, and we are committed to making every project a success.

SERVICES

HuntingtonParkingLot 300x169 Our Services

New Construction

  • Specializing in Design Build Projects
  • Site Preparation
  • Excavating
  • Site Utilities
  • Drainage Installation
  • Asphalt Paving
  • Concrete
  • Project Site Management

General Contractors

  • Expert Project On-Site Management
  • Concern for Details
  • Flexibility to Address Field Issues
  • Focus on a Quality Finished Project
BuehlersParkingLot 300x169 Our Services

ASPHALT PAVING

Vasco has over 45 years of expertise in asphalt paving and is widely regarded as one of the highest quality paving contractors in Ohio.

CONCRETE

Vasco offers turn-key solutions for all your concrete needs – saving you time and scheduling hassles and ensuring a professional experience and end result.

EXCAVATING

Before asphalt can be put down the site needs to be prepared through stone and fine-grading, drainage installation, and the installation of site utilities. Vasco’s excavation division has the experience needed to ensure that the site is ready.

Vasco uses the most advanced laser controlled excavation equipment to ensure proper slope and compaction on the project’s stone base, helping to ensure the longevity of the parking lot. Vasco Asphalt Company can perform excavation, grading, and paving on any project.

DRAINAGE INSTALLATION

Proper drainage for rainwater is essential to prevent water damage and winter cracking in asphalt pavement. Vasco Asphalt Company eliminates surface and sub-surface drainage issues for proper outflow, increasing the lifespan of your pavement.

MILLING

When asphalt has degraded over time, the simplest cheapest solution is often to mill the existing pavement down to the desired depth, then repave overtop of the new base. This method costs you less money than full excavation, and all waste material is 100% recyclable.